top of page
Inaugura-AMLO-Línea-3-Gobierno-de-Jalisco.jpg

Line 3 of the light rail

Guadalajara.

LOGO_FULL ENERGY_FONDO OBSCURO.png

PRESENCE 

We are a flexible organization with a strong growth drive that is constantly looking for expansion opportunities.

PROFESSIONALS IN

Consulting and Engineering, in the Energy Sector.

CAPACITY AND EXPERIENCE

We have reached a capacity and experience that allow us to provide confidence to our clients, always working hand in hand with our team of professionals. 

Photovoltaic Aguascalientes Power.

Tuning of the mathematical models PSSE V32, 34.5 and 35 and EMTP to represent the actual behavior of the plant in the field. Execution of Voltage Control Tests, FP Control, Reactive Power Control and Active Power Control for validation of the Grid Code.

SCADA-CANADIAN-real.jpg

Los Cuervos Solar Park.

Tuning of the mathematical models PSSE V32, 34.5 and 35 to represent the actual behavior of the plant in the field. 

Aura-solar.jpg

Aldebaran Photovoltaic.

Tuning of the mathematical models PSSE V32, 34.5, 35 and EMTP to represent the real behavior of the plant in the field. Execution of Voltage Control Tests, FP Control, Reactive Power Control and Active Power Control for validation of the Grid Code.

REF0354A.jpg

Steel Group, Foundry.

Attention to the requirements for the commercial operation with CENACE.

Request for connection studies through SIASIC V2 including the preparation of Annex IV.
 

cenace.png

Queretaro Industrial Park.

Power Quality Study for Compliance with the Network Code. Mathematical modeling in EMTP and attention to the requirements of Annex II of the POC. 

084-parque-industrial-queretaro.jpg

Aerotech Industrial Park

Attention to the requirements of Annex II of the POC. Preparation of the EMTP model and Annex IV of the Manual.

Aerotech.jpg

Continental Guadalajara and San Luis

Request for connection studies through SIASIC V2 including the preparation of Annex IV.

Preparation of the Power Quality Study for compliance with the Grid Code.
 

Continental.PNG

Caterpillar Ramos Arizpe

Field survey for preparation of Annex IV of the Manual and preparation of the EMTP and PSSE model.

Caterpillar.jpg

Kitagawa.

Power Quality Study for Grid Code Compliance. Mathematical modeling PSSE V32, 34.5 and 35. Installation of SEL 735 meter for power quality.

kitawa.png

Line 3 of the Guadalajara light rail.

Basic and detailed engineering for the standardization of the measurement system for settlements.

Inaugura-AMLO-Línea-3-Gobierno-de-Jalisco.jpg

Enerpyme Industrial Park

Request for connection studies through SIASIC V2 including the preparation of Annex IV.

Pyme.jpg

Odata Vynmsa

Negotiations with CENACE for the attention of commissioning requirements.

Odata.jpg
bottom of page